The “Save the Home Decree” (Decreto Salva Casa)

The “Save the Home Decree” (Decreto Salva Casa) introduces important new rules for those who wish to bring their home into compliance, especially where there are minor building irregularities.

In this article, by Attorney Marco Martinoia, we take a closer look at the now-famous “Save the Home Decree” (Decreto Salva Casa, Decree-Law No. 69 of May 29, 2024, “Urgent Provisions on the Simplification of Building and Land-Use Rules”), which was issued by the government and has now been definitively converted into law by Parliament (Law No. 105 of July 24, 2024, published in the Gazzetta Ufficiale, the Official Gazette, General Series No. 175 of July 27, 2024). Let us look together at the main changes for the real estate market, also in light of the latest amendments made at the conversion stage.

New Habitability Requirements

  • Micro-apartments: homes can now be “micro,” since the minimum floor area for one person falls from 28 to 20 m², and for two people from 38 to 28 m².
  • Ceiling heights: minimum interior heights are reduced from 2.70 to 2.40 m.
  • Attics: the conversion of attics into living space is always permitted, even if the work does not allow the minimum distances between buildings and from property boundaries to be respected.

Simpler Changes of Use

Changes of use (cambi di destinazione d’uso) are always allowed, both within the same functional category and between different functional categories (residential, tourist accommodation, production and office, commercial), in all urban zones (A, B, and C).

If the works needed for the change of use fall within the category of permit-free building (edilizia libera), the change will be treated as one without works, while changes of use with works are allowed with a certified notice of commencement of works (SCIA).

Wider Construction and Execution Tolerances

Construction Tolerances (tolleranze costruttive)

For works already carried out, that is, completed before May 24, 2024, differences between what was authorized and what was built are allowed if the deviation from the original design does not exceed:

  • 2% for property units with a usable floor area of more than 500 m²;
  • 3% for property units with a usable floor area between 300 and 500 m²;
  • 4% for property units with a usable floor area between 100 and 300 m²;
  • 5% for property units with a usable floor area of less than 100 m²;
  • 6% for property units with a usable floor area of less than 60 m².

Execution Tolerances (tolleranze esecutive)

The following are tolerated:

  • a building smaller in size than the one authorized;
  • non-structural architectural elements that were not built;
  • minor geometric irregularities and minor changes to the finishes of buildings, irregularities in the execution of external and internal walls, and internal openings placed differently from the design;
  • works falling within the definition of ordinary maintenance that were carried out differently from the design;
  • design errors corrected on the construction site, and clerical errors in the drawings representing the works.

A Simpler Way to Establish Lawful Status

To establish a property’s lawful status (stato legittimo), it is enough to refer either to the building authorization (titolo abilitativo) that provided for the construction of the property (or for its regularization, known as sanatoria) or to the one that governed the most recent building work, provided that the competent authority, when issuing it, verified the legitimacy of the earlier authorizations, supplemented by any later ones that authorized partial works.

The decree has also introduced the principle that, within condominiums, the common parts are independent of the individually owned units: any building discrepancies in the common parts will no longer affect the individually owned units, and vice versa.

Simpler Regularization for Pre-1977 Works

The decree introduces the regularization of variations that depart from an authorization issued before the Bucalossi Law of 1977: these are partial discrepancies that arose in the course of construction and that today fall outside the limits of the construction and execution tolerances widened by the decree. It does not cover essential variations (variazioni essenziali) from the building permit (permesso di costruire) that was issued, or works carried out without a building permit or in total departure from it.

More Permit-Free Works

The following fall expressly within permit-free building (requiring no building authorization or permit of any kind):

  • the installation of removable panoramic glass panels, awnings, and other works providing protection from the sun and the weather;
  • the installation of heat pumps of up to 12 kW;
  • the removal of architectural barriers, provided that it does not require the installation of external elevators.

Simpler Conditions for Regularization

Regularizing partial discrepancies and essential variations by means of a SCIA becomes more accessible, and the principle of tacit approval (silenzio assenso) is introduced: municipal offices will have to rule on applications for regularization within 45 or 30 days, and in the absence of a reply the application will be deemed granted.

Abolition of Double Compliance for Building Regularization

To regularize “minor” unauthorized building work (works with partial discrepancies), it will be necessary only that the work be in line with the land-use rules in force at the time of the application (not with the rules that were in force when the unauthorized work was carried out).

Works carried out without a permit or with essential variations from the building authorization, on the other hand, remain subject to the rule of double compliance (doppia conformità): that is, they must comply with land-use and building regulations both at the time they were carried out and at the time the application is submitted.

Longer Deadlines for Demolition

The deadline for demolition has been extended from 90 to 240 days where there are proven health needs or serious situations of social and economic hardship.

Lower Regularization Payments (oblazioni)

The maximum fine for a SCIA filed for regularization (SCIA in sanatoria) has been reduced from €30,984 to €10,328, while for works that satisfy the rule of double compliance the penalty ranges from a minimum of €516 to a maximum of €5,164.

In conclusion, we can say that the changes are many and could certainly have a significant impact on the real estate sector, depending also on how local authorities implement certain of the provisions.

Translated from the Italian. Read the original

Portrait of Marco Martinoia
The Author · Safe Home

Attorney Marco Martinoia

A lawyer admitted to the Padua Bar and co-founder of Legal Pass, Marco Martinoia writes the column “Safe Home” for LoveImmobiliare Magazine.

Keep Reading